QUOTE REQUEST
Individual Requesting Quote: Scott Cupicciotti Quote Due Date& Time: Friday 10/16/2020 10:00AM
Date of Request: Tuesday 10/13/2020 Department:Corrections Phone Number: 904-445-9646
Project Name: CPSO- Prison Roof R&R ProjectDirector: Scott Cupicciotti Project Start Date: TBDProject Completion Date: TBD Grant Name & #:N/A
All responses to this quote solicitation must be completed using this form and must be
transmitted using one of the three delivery options below:
(1) Email: nory@cpso.com
(2) Physical Delivery: Accounting – 5716 Broad St. Lake Charles, LA 70615
ALL OTHER TRANSMISSIONS WILL NOT BE ACCEPTED OR HONORED.
The Calcasieu Parish Sheriff’s Office is requesting detailed, itemized,
written quotes for the following scope of work/project:
Scope of work/Project Description: See attached scope and specification.
Specific insurance [X ] will be required [ ] will not be required for the completion of the scope of work/project above. If specific
insurance will be required, please see attached insurance requirements.
A separate contract [X ] will be required [ ] will not be required prior to completion of the scope of work/project above. If
separate contract is not required, this quote request will become the contract.
Any public works contract (as defined by LA R.S. 38:2211(12)) which is greater than $25,000 requires a 100% payment and performance bond. Any quotes greater than or equal to the following shall be delivered in a sealed envelope to Purchasing with an
applicable Louisiana Contractor's License number printed on the outside of the envelope: $50,000 for public works; $10,000 for electrical and mechanical; and $1 for hazardous materials.
Vendor’s Price Quote Excluding Taxes: $If requested, the
Calcasieu Parish Sheriff’s Office will provide a tax-exempt certificate. Quotes must be inclusive of all costs (material, labor, installation, FOB destination, freight prepaid & allowed, any rentals, fees if required, etc).
Quote effective from: to Quote
submitted by:
Company Name
Company Phone Number:Fax Number:
Signature of Person Submitting QuoteName Printed
Name Printed
SECTION
01010
SUMMARY
OF WORK
PART
1 GENERAL
1.01 SUMMARY
A. Project Summary:
Calcasieu Parish Sheriff’s Complex
5310 Broad St
Lake Charles, LA 70615
Cell Building
1. Remove modified gravel roof, lightweight concrete and sheet metal items down to
the metal pan.
2. Remove existing 26 ga. galvanized pan.
3. Provide new 22 ga. galvanized B deck and secure to bar joist with using the applicable design codes, namely IBC 2015 and ASCE 7-10.
Fasten with #12-24 Tek Screws fastened at a 36-7 pattern are sufficient for all locations of the roof.
4. Provide and install new roof hatch to match existing. Ensure base flashing height is a minimum of 8” above finished roof height.
5. Provide new wood blocking fastened according to FM 1-49 Loss Prevention Data Sheet.
6. Mechanically attach 2.0” Polyisocyanurate (Iso) insulation, 2.5” Polyisocyanurate Insulation,
1/4”
tapered Iso Insulation, 1/2” tapered Iso crickets and ½” gypsum board utilizing #14 HD fasteners and 3” plates. Fastening pattern shall be 24 fasteners per 4x8 board in Zone 1 and Zone 2 and 36
fasteners per 4x8 board in Zone 3. Slope to internal drains. Insulation to be provided by Modified Bitumen
Manufacturer.
7. Heat fuse one ply of a Type III, SBS modified base sheet (HPR Torch Base by The Garland Company,
Inc.) across the entire roof area in shingle fashion starting at the low points (drains).
8. Fabricate and install new 24ga stainless steel gravity vents, 24ga stainless steel pitch pans with hoods, and 4lb lead flashings at
soil stacks and new drains.
9. Prime all metal flanges and set in a liberal bed of elastomeric sealant.
10. Strip in flanges with the specified SBS base sheet.
11. At all curb type penetrations, apply a SBS fire related self-adhered membrane and secure with termination
bar.
12. Across the entire roof area and curb type penetrations, cold applied at a rate of 3 gallons per Square (Greenlock membrane
adhesive) Type III, SBS Mineral Surfaced modified cap sheet(Optimax FR Mineral). Immediately broadcast granules into bleed out.
13. Apply one layer of a mineral surfaced cap sheet in flashing adhesive up wall and secure with termination
bar.
14. Provide and install new ANSI SPRI ES-1 metal edge assembly(Rmer Force by The Garland Company,
Inc.)
15. Apply two coats of a non-fibered aluminum coating (Garlabrite by The Garland Company,
Inc.) across the entire roof area and flashings.
16. All roof top equipment shall be secured to the curbs with stainless wires or straps.
NOTE:
- Basis of Design: The
Garland Company, Inc. (225) 266-5179.
- Contractor shall provide a
FM Global Rated and Tested Assembly that meets or exceeds the required pressures.
- Metal Edge shall also meet
or exceed ANSI/SPRI ES-1 requirement for pressures.
- Issue
Owner 40-year edge to edge warranty with special wind rider for damage up to 130mph wind speed. Warranty shall include deck, insulation
and metal
edge assembly.
*ASCE 7 wind uplift
calculations shall be stamped by a licensed Engineer in the State of Louisiana.
- Manufacturer shall provide
progress inspections a minimum of three day a week. The inspections shall be documented in writing along with progress photos ensuring the SOW is being
followed. -Written reports shall be turned in by the end of the business day on Fridays.
- Successful bidder shall provide sample warranty with wind rider, a letter from the manufacturer that they are an
authorized
applicator and current printed details for all penetrations and walls prior to beginning work.
Maintenance Building
1. Removed built up roof, lightweight concrete and related sheet metal items down to the
concrete deck.
2. Provide new wood blocking fastened according to FM 1-49 Loss Prevention Data
Sheet.
3. Prime concrete deck with quick dry primer and allow to dry.
4. Across entire roof are install one ply vapor barrier.
5. Provide and install 2.5” Polyisocyanurate (Iso) insulation, and ¼” tapered Iso insulation.
6. Provide and install ½” gypsum board to the tapered Iso insulation.
7. All insulation boards shall be set in ribbons of adhesive. Ribbons shall be 4” o.c. in Zones 1, Zone 2, and Zone 3. Zone width is 8’.
8. Heat fuse one ply of a Type III, SBS modified base sheet (HPR Torch Base by The Garland Company,
Inc.) across the entire roof area in shingle fashion starting at the low points (drains).
9. Fabricate and install new 24ga stainless steel gravity vents, 24ga stainless steel pitch pans with hoods, and 4lb lead
flashings at
soil stacks and new drains.
10. Prime all metal flanges and set in a liberal bed of elastomeric sealant.
11. Strip in flanges with the specified SBS base sheet.
12. At all curb type penetrations, apply a SBS fire related self-adhered membrane and secure with termination bar.
13. Across the entire roof area and curb type penetrations, cold applied at a rate of 3 gallons per Square (Greenlock
membrane adhesive) Type III, SBS Mineral Surfaced modified cap sheet(Optimax FR Mineral). Immediately broadcast granules
into bleed
out.
14. Apply one layer of a SBS mineral surfaced cap sheet in flashing adhesive up wall and secure with termination
bar.
15. Provide and install new ANSI SPRI ES-1 metal edge assembly (Rmer Force by The Garland Company, Inc.)
16. Apply two coats of a non-fibered aluminum coating (Garlabrite by The Garland
Company, Inc.) across the entire roof area and flashings.
17. All roof top equipment shall be secured to the curbs with stainless wires or straps.
18. Contractor shall include the disconnection of existing chill water lines prior to beginning work.
NOTE:
- Basis of Design: The
Garland Company, Inc. (225) 266-5179.
- Contractor shall provide a
FM Global Rated and Tested Assembly that meets or exceeds the required pressures.
- Metal Edge shall also meet
or exceed
ANSI/SPRI ES-1 requirement for pressures.
- Issue Owner 40-year edge to edge warranty with special wind rider for damage up to 130mph wind speed. Warranty shall include deck, insulation
and metal edge assembly.
*ASCE 7 wind uplift
calculations shall be stamped by a licensed Engineer in the State of Louisiana.
- Manufacturer shall provide progress inspections a minimum of three day a week. The inspections shall be documented in writing along with
progress photos ensuring the SOW is being followed. -Written reports shall be turned in by the end of the business day on Fridays.
- Successful bidder shall provide sample warranty with wind rider, a letter from the manufacturer that they are an authorized applicator and
current printed details for all penetrations and walls prior to beginning work.
C.Particular project requirements:
1. Existing site conditions and restrictions: The building will be occupied at the time of construction and care must be taken not to
disturb normal operations of the occupants.
D.Permits: Apply for, obtain, and pay for permits required to perform the work. Submit copies to Owner.
E.Codes: Comply with applicable codes and regulations of authorities having jurisdiction. Submit copies of inspection reports, notices
and similar communications to Owner.
F. Dimensions: Contractor is responsible to field
verify dimensions and penetrations.
G.Existing Conditions: Notify Owner of existing conditions differing from those indicated on the drawings. Do not remove or alter
structural components without prior written approval.
H.Definition for terms used in the Specifications:
2. Provide: Furnish and install, complete with all necessary accessories, ready for intended use. Pay for all related
costs.
3. Approved: Acceptance of item submitted for approval. Not a limitation or release for
compliance with the Contract Documents or regulatory requirements. Refer to limitations of “Approved” in General and Supplementary Conditions.
4. Match Existing: Match existing as acceptable to the Owner.
5. Intent: Drawings and Specifications are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner.
Anything not expressly set forth, but which is reasonable implied or necessary for proper performance of the project shall be included.
6. Writing Style: Specifications are written in the imperative mode. Except where specifically intended otherwise, the subject of
all imperative statements is the Contractor. For example, “Provide tile” means Contractor shall provide tile.
PART 2 -
PRODUCTS -
Not applicable to this Section.
PART 3 -
EXECUTION -
Not applicable to this Section.
END OF SECTION